Retail vacancies abound near the Bedford Avenue L stop
Eye on Real Estate
L-mageddon already has a prime span of Williamsburg’s Bedford Avenue in its grip.
The L-train shutdown between the Bedford Avenue station and Manhattan doesn’t start until next April. But construction machinery already clogs the streets outside the L train stop at the intersection of Bedford Avenue and North 7th Street.
The North 7th Street block between Bedford and Driggs avenues is closed to vehicular traffic for construction in the road bed. A sign posted there says the closure will continue until June 2019.
Work is underway to make improvements on the Bedford Avenue station. An online posting by the MTA says two new street-level stairways are being added to the station’s Bedford Avenue entrance, and two others are being added to its Driggs Avenue stop.